Management of special projects (compendium of lecture NUPSU)

Vibir project

Projektuvannya ов to prodvizhennyam planuvannya robit on a realizatsії project. It’s possible to lay down the furthest robit of the project. The project includes two steps:

  1. Virіshennya organizatsіynih food projectvannya.
  2. Rozrobku that Uzzhenzhennya design documents.

Persian etap - organizing nutrition of the project, including:

  1. Vibir project, seal, preparation and contract management.
  2. Planuvannya robit that uzgodzhennya documentation

Є three approaches to the vibration of the project and the contract with them:

a) Projects of smokers give servants to the world of need . Yakshcho is the deputy of the post office with the engineering engineer and the architecture firm, and they can talk about the above services to the world. Tsey sposib naybіlshe vikoristovuetsya in municipal projects.

b) Close the conversation . Yakshcho firma even nadaє services to the deputy, in that you can please her without pleasing the competition. At the time, the contractor is guilty of presenting a proposition of costly and maximum wartosti robots.

c) The competition . Oskilki robots with a project manager in the minds of the competition are much more ripe, to which the whole range of rights and the obligations of the project manager are regulated by typical provisions on project contracts.

Planuvannya robit that uzgodzhennya documentation. The project manager is guilty of having a detailed plan (program) of work, with the flaw of the concept of the deputy, the work of the clerk, the information materials, the costoris process. Vin is guilty of banning an adequate robbery of oath, and a representative of the postal manager and the worker.

The plan is guilty of including an ignorant description of the main and subsidiary robots of the meanings of the individual division.

As a matter of fact, with an alarming organization, a direct contract will be arranged, then a project of a tutor will need a more detailed project of preparation and preparation of a house for necessary materials.

As the owner of the license for technology, I’ll follow the development of the technological process according to the specifications of the technological possession, then the special technologists for the technology, but the project will not need to see the work.

In this way, the project manager is guilty of the mother of wow about organizing work with the company, and then the project.

In addition, in the plan of the robot, the required number of health changes during the course of the project is scheduled.

Pislya praising the plan of work by the assistant to fix the main step of the work - the project and the documentation.

The practice of organizing a project in more than one country including two stages of a project for developing documents:

  1. the front of the project (pre-project), or the graphical (final) project;
  2. residual (technical) project - working armchairs and specifics.

But before you reach the top of this document, it’s guilty but it’s been scanned by the TEO project.

Taking a plan for the project to get involved is the best way. When designing foldable industrial objects for 10–12 months, for non-folding –1.5–2 months.

Undertaking a pre-project including offensive see robot:

  1. Formulation of functional functions;
  2. vibration of the playground;
  3. recognition of the need for technological processes;
  4. a rozrobku varіantіv pіdklyuchennya ob'єktu to transport and engineering komunіkatsіy;
  5. viznachennya and vorostny vartosti of the weekly and the operation of the planned vitality of the object and object - analogue;
  6. a detailed understanding of the principles of constructional design and equipment;
  7. forward virishennya nutrition about the dandy of land dilnitsі.

By skin appearance, it’s due to the formulations of the pre-project that are stored in the hair of Koshtoris Vitrat.

Another stage of the project is the preparation of working chairs and the specifics - repair is done after the project with the assistant.

Residual (technical) project including offensive distribution:

  1. architectural and planual;
  2. alarm clock;
  3. engineering systems (plumbing, electrical).

A frequent project є specifics . They provide descriptions of the types of robot systems and engineering systems, the list of materials and designs, and the instructions for the operation and specifications. For the deputy specialty, I’ll give you a clear note about the appearance of the maybutnogo view, for the working stench, with the technological instruction on the issue of virology.

The project is completed with the remaining koshtoris , which includes the preparation of the robot for the weekly work, the preparation of the room before the arrival, as well as the special robots, including a subcontractor.

Accuracy and viability of Koshtoris Vitrat, Deputy Assistant, as one of the most important criteria for project effectiveness.

In the United States, it is a practice to pay up to 25% of project pay by design companies at times redistribution of actual Vitrats is 1.5% lower than contract rates, and at times 1.5% is canceled.