14. Installation and operation of the RCD in the electrical
14.2. OPERATIONAL CONTROL RCD
After putting into operation the power plant to remind the owner of the power plant on the monthly check of serviceability of the RCD is advisable to use Maps service inspection, a specimen of which is given below. Gallery is located on the inner side of the door ASU (Distribution board).
If Distribution board has two or more RCD should mark them and fill in the appropriate line cards at the time the power plant building in operation.
According to the rules of operation of electric consumers (5th ed. 1999 p. 2.7.14) residual current device should be checked periodically in accordance with the manufacturer's recommendations.
RCD should be sealed and made entries in the device data sheet and operating log.
Periodic verification of the RCD monthly performance by pressing the "Test" button.
The mark on the health of the RCD is stored in the appropriate column control maps.
CARD CONTROL RCD number _______ Address ____________________________________________________________ FULL NAME. responsible for the electrical installation ___________________________ Date of issue and number of the certificate on the installation ___________________
Responsible for electrical installation inspection ___________ ______________ |
Comments
Commenting, keep in mind that the content and the tone of your messages can hurt the feelings of real people, show respect and tolerance to his interlocutors, even if you do not share their opinion, your behavior in terms of freedom of speech and anonymity offered by the Internet, is changing not only virtual, but real world. All comments are hidden from the index, spam control.