Theory and Practice on short circuit

What documents do you need to provide a legal entity (the owner of the building) to conclude a supply contract?

What documents must be collected for re-registration of the contract of power supply when changing the owner of the premises?

Do I have the right to make the apartment 3 phases?

Can I increase the capacity of the apartment permitted from 3 to 10 kW? What you need to do, where to go and what documents?

What is the rate for electricity is set for members of the non-profit horticultural society and they belong to which group?

How many years have to keep receipts for payment of electricity?

Disconnecting air conditioners in case of fire

Who should perform the grounding Ventilation equipment?

How to calculate the average power factor?

Minimum distance for the parallel laying of power and data cables to the SCS

Common routing power and data cables

On the procedure for renegotiation of design solutions (project grids)

About cosine "Phi" in the design of electric systems

What are the advantages of separation PEN conductor is in the Verkhovna Rada (as is required by the current rules), and, for example, in Qp?

What cable (1 kV) should be used for laying in trenches and how it should be provided protection?

Can the laying of communications in underground trench, to lay in a trench telephone cable and electric? And what minimum depth under the ground they need to be laid?

Flickering monitors

What is the voltage unbalance (phase shift)? For some reason there? Ways to prevent.

How to understand the "connection boards - train through the box" and "Connection jobs - loop"?

Regarding the power train outlet

Selection of hardware automation of hazardous industrial sites

Identification and selection of equipment operating in a gas medium

Labelling and selection of equipment for dust protection

What the Russian regulatory documents regulate the need for anti-static flooring?

Theory: Anti-static flooring

Newsletter Prescription number 12-2002 from 27.11.2002, "On the order of admission of electrical administrative buildings"

"Regulation on the authorization of the ADMISSION INTO OPERATION OF POWER"

Organization of work on the issue of permits for admission to the operation of power plants

Earthing systems - classification, designation.

International designations electrical voltage up to 1 kV

General requirements for the potential equalization system and ground-niju

Properties connecting conductors

protective ground

The vanishing

Cutout

What is re-ground and what is it used? What is its scope?

COMPUTER - a computer grounding, the use RCD

Why copper wires preferably aluminum?

Potential equalization system

Is there a difference between equalization and potential equalization?

What it is (for "SEP"), the mid-point in the direct current (DC source) and why it should be grounded?

Wiring

Electroset cottages, villas

Protective grounding of the cottage

Some tentative answers faults in electric

The problems of power supply network

About vzaimorezerviruyuschih laying cables in trenches

What is a "dry contact"?

How to serve the lamps above the pool?

Connecting two MSB interconnected grounding conductor

What are the "pros and cons" use of wires SIP?

What does the word "Feeder"?

Why in household consumers (for example, a wall outlet), - phase and zero, and not the phase and phase?

The new generation of electric cables with improved fire-term security

What is the fundamental difference between the wires "PV1" and "PV3"?

Using constraints "ABB" voltage

Facilities for animals. Requirements NTD

Whether the implementation of the protective earth metal tray is required for the cables low-voltage systems (telephony, computer network, security alarm, fire alarm systems, TV, radio, etc.)?

and much more ...

Download file (DOC, 287 KB)

Other useful materials from Vladimir Kuzmenko