PROJECT "RECORD !!!"
NEW TECHNOLOGY OF CONSTRUCTION AND REPAIR OF UNDERWATER FACILITIES

Scientific and technical edition on the newest energy-saving and environmentally friendly technologies

Byshevsky Mikhail Alekseevich

Description of the technology and its application in the oil and gas industry

The connection of power (supporting and bearing) structural elements occurs not along the ends and joints, but over the surfaces (ie, on a much larger area) of the parts being joined. Such a solution provides not only an increase in the safety factor at individual junctions, but will also give the entire structure a quality monolith. The connection takes place by filling the Special mix (know-how) of the free cavities in the docking station. The main thing is that such a reliable connection takes place under water and does not require any preparation and processing of the parts to be connected, and the operation itself is so simple and principled that, to accomplish it and control, there is no need for direct participation of the human intellect.

Industrial development of R & D results will give a huge impetus to the development and development of deep-sea offshore oil and gas fields, as well as in more efficient and economically justified projects for the reconstruction and repair of already underwater structures: oil and gas pipelines, platforms, terminals,

Benefits and advantages of technology

In connection with the development of increasingly deep-sea and remote deposits by marine oil companies, there is a need to build huge and massive structures on the shelf. The absence of progressive methods in the construction of underwater endings of structures has already provoked extensive growth (by weight, displacement, deadweight, capacity, etc.) of the special technological fleet, which in turn affected the sharp increase in the estimated construction costs and payback periods Up to 10 years!). Mastering the methods of "New Technology ..." will significantly (up to 40%) reduce the capital costs of offshore development and, even more significantly, start implementing new, pioneer Projects - the construction of autonomous underwater complexes ("wet" and "dry" type) to Drilling, operation and partial processing of hydrocarbons directly on the seabed.

If we single out the R & D context from the context, only the "Technology of repair of underwater pipelines", today we can claim the VIVIENCY: any kind of destruction, any depth of occurrence, uniformity in methods and approaches, in a set of equipment, materials and tools. And responsibly I declare: I am ready to perform repair of any complexity for half of the price that the competitors will offer.

In the field of construction of underwater facilities, completely new opportunities open: at the beginning, directly under water, assembling and assembling from separate sections, modules and structures is made and then - the final connection of all units of the structure. For the Specialists, the technical advantages are obvious. For economists advantages on the surface - there is no need to use SUPERSPETSTHFLOT.

13 years have passed since the implementation of the "pilot project":

At the depth of the sea (102 m.), Two parts of the anchor-torn floating crane of the main oil pipeline (530 by 14, 22 inches) were connected by means of an original larger diameter clutch and the filling of the space between the clutch and the parts of the oil pipeline SPECIMEN (know-how). This oil pipeline was safely operated until the end of its life - another eight years. More than one million US dollars of net profit was earned by the General Contractor (NPO SESAME), who purchased from me a one-time License (for 200,000 Soviet rubles), appointed me Chief Engineer and Head of Underwater Technical Works for the repair of a deep-water oil pipeline.

Intellectual Property Rights

As the sole author, the stated topic of research and development of "NEW TECHNOLOGY ..." I am reporting that I never received the Order and was not funded by this topic.

Back in 1989-90, on behalf of my team of TC "CASPIY" (a creative union of scientists, engineers and designers), I submitted four applications for the "repair of pipelines" and received "Positive Decisions on the issue of Patents of the USSR." But, when he started field experimental and research work, he discovered the inconsistency of earlier proposed Solutions (practically refused support for Patents), found new Solutions, which he embodied in the "pilot project". I do not make new decisions, because I realized that a more professional approach to patenting is needed, and this is expensive for me. Having discovered the know-how, I can safely demonstrate to the Customer the possibilities of "New Technology ..." I know about inconclusive attempts to unauthorizedly use the methods of "NEW TECHNOLOGY ..." While GOD was merciful ...

What additional development is needed for "NEW TECHNOLOGY ..." and what will be required
Necessary amount of financing?

The conceptual part of the "New Technology ..." in the field of repair and reconstruction of underwater endings of structures can be considered complete and confirmed by 100%. For completion in this "part", covering the whole variety of "underwater structures", it is necessary to develop a single Technical (RD, TU), Technological (PPR and TB), Design (for the whole model range) Documentation; Patenting of Ways, Devices and Promotional tools; Manufacturing and field, certification tests; Performance of experimental and experimental works; The creation of a service repair and reconstruction campaign, with the functions of the General Designer, the General Contractor and the Production and Environmental Control of Underwater Facilities and / or the sale of Licenses and the training of marine engineers in the methods of "New Technology ...". For the successful completion of this Phase and before the commercialization of the Project, I need one million US dollars and 12 months of deadline.

The concept of "Construction", as more promising, will require a more conservative and systematic approach, so its development in the beginning will take place within the framework of the "Repair and Reconstruction" Development. Additional funding will be required for patenting and manufacturing models - ($ 300,000), and further - by refinancing funds from the capitalization of the first stage of commercialization of the Project.

To whom I address and what can I promise

1. To the Campaign , which is already an active participant in the development of offshore oil and gas fields: together with you, we will more actively and rapidly develop the results of R & D and then any participation in the tender for the construction of offshore facilities will become a formal contract award (the last phrase, With your interest, I will explain on a practical example).

2. To Financial Capital
It is no longer necessary to be a visionary and clairvoyant to predict that the near future of Mankind, its safe and comfortable existence, is related to how actively and intensively the industrial (ecological!) Development of the resources of the Ocean will take place: energy (there are in view of renewable energy sources - mass (Large-scale open-pit deposits have been explored, but the extraction of minerals will be economically justifiable if primary processing and enrichment are organized on site - it is necessary to build concentrators, large underwater and / or surface structures), food ( establishment of farm ecosystems , Where the extraction and reproduction of ecologically pure protein of mollusks and crustaceans will be competently conducted).

There are no progressive methods and technologies in the way of construction of underwater structures , otherwise many wonderful Projects would find their Investors, and not only would the Oil Workers be on the shelf, although it becomes clear to them that the extensive way in construction leads (already led! ) To the impasse.

OCEAN - already now is a huge market for efficient investments. But superficial (both in direct and figurative sense) its development occurs on the "island" areas of the national shelves of the seas.

FINANCING THE R & D OF "NEW TECHNOLOGY ..." AND THE INDUSTRIAL DEVELOPMENT OF THE RESULTS IS THE "KEY" TO THE OPENING OF THE VOLUME (READ: GLOBAL, NEW) MARKET OF INVESTMENT OF CAPITALS IN THE PERSPECTIVE OF THE CREATION OF A NEW ENVIRONMENT OF COMFORTABLE HABITS OF MANKIND - OCEAN.

3. To a State that does not have maritime boundaries and access to the OCEAN
Having created favorable conditions for the development of R & D TOPICS ... - You get all the advantages listed in points 1 and 2 plus the creation of the National Marine Corporation, which, after the successful implementation of several Offshore Projects, will predetermine the entry of the "landed" State in the elite Sea Power Club and quite Can claim the long-term development of a certain part of the World Ocean, using the Right of Equal Access to its (ocean) resources.

print version
Author: Byshevsky Mikhail Alekseevich
PS Material is protected