Legal encyclopedia. Letter P

PAYMENT FOR THE USE OF MINERALS

Includes:

1) one-off payments for the use of subsoil in the event of occurrence of certain events specified in the license. The minimum amount of one-off AP for PN is set at a rate of not less than 10% of the amount of the mineral extraction tax based on the average annual design capacity of the extracting organization. The final sizes of one-time payments for the use of subsoil are established by the results of a tender or auction and fixed in a license for the use of subsoil;

2) regular payments for the use of subsoil which are collected from subsoil users separately for each type of work carried out on the continental shelf, in the exclusive economic zone and outside the Russian Federation in the territories under the jurisdiction of the Russian Federation. Regular payments

Are charged for granting exclusive rights to mineral resource users to search for and evaluate mineral deposits, prospecting for minerals, geological studies and assessing the suitability of subsoil plots for the construction and operation of facilities not related to the extraction of minerals, construction and operation of underground structures not related to the extraction of useful minerals Fossils, with the exception of engineering structures shallow (up to 5 m), used for their intended purpose.
Regular payments for the use of subsoil are not charged for: the use of subsoil for regional geological study; Use of subsoil for the formation of specially protected geological objects that have a scientific, cultural, aesthetic,

Sanitation and other value; Exploration of minerals on deposits put into commercial operation, within the limits of the mining allotment granted to the user of subsurface resources for the extraction of these minerals; Exploration of minerals within the boundaries of the mining allotment granted to the user of subsurface resources for the extraction of this mineral;

3) payment for geological information on subsurface, which is provided for the use of geological information on the subsoil obtained as a result of state geological study of subsurface resources from the federal government of the state fund of subsurface resources. The amount and procedure for charging fees in this case are determined by the Government of the Russian Federation;

4) fee for participation in the tender (auction), which is made by all participants and is one of the conditions for registration of the application. The amount of the fee is determined based on the cost of the costs of preparing, conducting and summarizing the tender (auction), the labor of the experts involved;

5) fee for issuing licenses, which is made by users when issuing a license.

The amount of the fee is determined based on the cost of the costs of preparing, conducting and summarizing the tender (auction), the labor of the experts involved. The amount of the fee for participating in the auction (auction) is credited to the accounts of the federal government of the state fund of subsurface resources or its territorial bodies and is used to cover the costs of these bodies, as well as bodies

The state power of the subjects of the Russian Federation regulating the process of using subsoil resources, to conduct competitions (auctions). In addition, subsoil users pay other taxes and fees that are established by the legislation of the Russian Federation on taxes and fees.

Payments for the extraction of minerals are determined as a share of the value of extracted minerals and production losses exceeding the norms established by the annual mining plans agreed with the state mining supervision bodies.

Payments from the volumes of excess losses are levied at a double rate, including all actual losses of minerals admitted for the period of operation without the annual plans agreed upon with the territorial bodies of the Gosgortechnadzor of Russia. In the event of a delay in agreeing annual plans on issues not related to the normalization of losses or arising out of the fault of the subsoil user, a separate agreement of the loss standards is allowed.