Management of special projects (compendium of lecture NUPSU)

5. City calendar and planning

The relevance of those given is enriched by the need for competent ceruvannya by great national complexes and projects, scientific achievements, design and technological preparation of new models, new types of basic repair, reconstruction of basic models.

5.1 Sutnist and see the calendar-plan plans

Calendar-plan of the project to the project , the structure of the functional complexes of work, the lines of the peculiarities of the week-end. Appearance and control of detailed graphs of work є with one of the top managers of project management by cob yoho realizatsії.

In the process of realizing projects, there are different calendar calendar plans, and the following:

- Counts of Gant;

- schedules;

- social graphs (method of evaluation and analysis of programs (PERT) and the method of critical hat).

Graphs (diagrams) Gantt - a horizontal line graphs, as well as clearly represent the hour of the hour, okremikh robit, the availability of a specific technological possession, but do not allow to choose the required amount of time. Tom graphі Ganta thoroughly victorious for trivial analysis of equal number of zavantazhenya virobnichih ploshch.

Schedules in the work schedule include work on the results of the work and additional robots (transmission of information, control of the results), if you allow me to revise the work, please turn on the plan.

City graphs - methods, basically meta poles, in order to speed up the project’s frustration as much as possible, stink include the critical hat method (ICS or CPM - Critical Path Method) and PERT - Program Evaluation and Review Techniqe)

The process of the transmission plan transmission, which is described in the robotic complex, for which you need to know:

  • robo list;
  • basic parameters;
  • viznazhennya interconnections between mizh robots.

The method of evaluation and analysis of programs (PERT) is the whole method of online analysis, which is used for evaluating the project for evaluating the project in case of high miscalculation of the estimates of triviality. The PERT is a critical method for critical assessment of the average value of trials, permissions are approximately estimated hours of completion and recommended for analysis of projects with a free run.

Critical hat method (CPM) (CMS) - ) a network analysis method, which is used to predict a project’s triviality for an additional analysis of the fact that it’s the last thing to do when it’s null and void (reserve value).

Critical nobility - ce seriya robit, yaka viznacha nairanіsha completed the project. You need a method that allows you to establish logical interconnection and interrogation robots, and also set an hour to complete the foreseeable robots and plan as a whole. An important element of the graph is є uninterrupted after-work rob_t.

In the fallow stage, the details are detailed: ears, single and closed windows.

Pochatkovі sіtki є naybіlsh detailed. The stinks are stocked up on a separate basis on specific holidays, with all the images and all the brains.

Single cards are more excitement, stink to double the ears of the given data.

A new website has been set up for a complete complex of all social media. Get out on the basis of integrate cobs and single sots.

Calendar planning according to the Moscow School of Economics will require a lot of input. Upon input, the procedure for direct and inverted passage through the network and the information on the possible lines of the completed project are indicated.

For the rashrahunku schedule according to the School of International Law, the necessary offensive data:

  • nabir robot;
  • vzamopov'yazanіst robіt;
  • assessments of triviality of skin and skin robots;
  • calendar for working hours for the project (in denyy vipads it is possible to add a calendar for leather robots);
  • calendars of resources;
  • obmezhdennya on the cob that zakіchenchenny okremikh robіt that etapіv;
  • calendar date of the cob project.

Be-yak zmіn to give an ear to the project will be mothers as a child to zmіnu rynіv vikonannya dermal robots.

Rivne project management, as a rule, enter the graphs of the week-end work with a lower step of detail. For great projects, such as including a decile, thousands of robots, a better structure, a structure that can be stored in graphs of the first and second and third levels:

  • calendar graph to the project;
  • enlargement of the calendar-calendar project;
  • detailed calendar and graphs of projects.

The calendar graph for the project of the main image, which is due to the deputy goiter, for the most part, for the main projects in the project. Behind the form is the whole graph, a kind of non-imaginative technological sound. Vikonannya tsyogo grafiku kontrolє, as a rule, kerivnik pіdprimstva. Tsey grafik sta obov'yazkovim pislya pislapisaniya contract_v with deputies. For his serpent - a graph for planning and coordinating the activities of the deputy and the contractor. Most of the indicators are based on koshtorys, scho additions to the ignoring koshtorisny norms, on a regular basis - analogue. An oath of robits, information and indicators is not significant in its entirety.

The enlargement of the calendar-project graph is the whole project graph, which is at the stage of detailing the project information for skin project. The designations for the project management are entirely and the project manager is to blame. Tsei riven the graph of permission є і і ​​і зап зап зап анов зап л показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ показ.

Detailed calendar-graphs of projects without any problems with local costors. The number of graphs assigned for cer- tain industrial projects is different because of the independence, but you can see the project (the publication of materials, the weekly work, and special work). Vidpovіdalnі for pіdproekti control vikonannya technology vimog, dotrimannya vikonavtsami graphіkіv robіt skinny. The information of the whole region is necessary for financial management and that for the management.